S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
170. If work is planned in a temporarily closed well, the authorization holder must, before carrying out the work, inspect the premises and the wellhead, maintain the wellhead and conduct a pressure and tightness test on the wellhead and the casings.
O.C. 1251-2018, s. 170.
In force: 2018-09-20
170. If work is planned in a temporarily closed well, the authorization holder must, before carrying out the work, inspect the premises and the wellhead, maintain the wellhead and conduct a pressure and tightness test on the wellhead and the casings.
O.C. 1251-2018, s. 170.